Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
1. The safety team of the team inspects the car body and inspects the bill of lading. The escort must wear anti-static clothing and necessary goggles and helmets. 2. The operator guides the tank truck to enter the designated loading platform, and cooperates with the driver to the good parking space. The driver delivers the tank key to the designated personnel for custody. The driver must not leave the guardianship during the whole process. 3. The operator connects the static grounding wire, loads the crane pipe, and confirms the correct filling form to start loading. 4. When the tank truck is filled to the specified liquid level, notify the pump area to stop the pump, close all loading valves, exhaust, remove the loading crane tube, and release the static electricity for about ten minutes. 5. Remove the static grounding wire, and the operator and the escort will confirm the separation of the crane and confirm the loading. 6. The driver, the escort, and the operator confirm and sign the safety of the vehicle body, and the loading personnel direct the driver to slowly drive out of the loading area. |
April 23, 2024
April 23, 2024
この仕入先にメール
April 23, 2024
April 23, 2024
November 20, 2024
November 20, 2024
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.